A geothermal invention labGuides / Cost of electricity

Guide · Toni Zemani · 20 November 2026, updated 27 November 2026

What geothermal electricity costs in 2026, and what sets the price.

New geothermal power costs $67 to $111 per megawatt-hour before subsidies, by Lazard's 2026 estimate, close to new utility solar at $40 to $98 and onshore wind at $37 to $99. A geothermal plant is paid for almost entirely before it produces anything, so that price depends on four things: what the wells cost, how much power each well delivers, how long that output lasts, and the interest rate on the money.

Numbers marked SIMULATED come from our own model and are scenarios built on assumptions. They are requirements for a design, and no plant has been built to them. Numbers from other organisations are quoted with their source.

01 / In brief

How much does geothermal electricity cost?

  • New geothermal plants: $67 to $111 per megawatt-hour unsubsidized, average $89, in Lazard's 2026 Levelized Cost of Energy+ (version 19.0).
  • Signed contracts: public geothermal power purchase agreements from November 2019 to June 2025 priced at $67.50 to $99 per megawatt-hour, for 10 to 30 years, as compiled in the 2025 Annual Technology Baseline of the National Laboratory of the Rockies (NLR, formerly NREL).
  • The US Department of Energy wants enhanced geothermal power at $45 per megawatt-hour by 2035, about 90% below where the technology stood in 2022. ARPA-E's SUPERHOT program aims under $30 for wells above 375 °C by 2040.
  • In our own model the same simulated plant costs $83.02, $43.35 or $35.00 per megawatt-hour depending on its capital cost and discount rate. The rock and the wells are identical in all three cases.
  • Zemanium's development target is $30 to $45 per megawatt-hour. It is what our hardware program is designed toward.

02 / Build cost

What a geothermal power plant and its wells cost.

ItemFigureSource
New-build geothermal plant, capital cost$5,135 to $6,635 per kWLazard LCOE+ 2026
Illustrative next-generation geothermal plant$7,000 per kW, fixed O&M $160 per kW-yearLazard LCOE+ 2026, from public estimates
Hydrothermal flash sites at 200 °C or hotter, identified in the USaverage $4,362 per kW overnight capital costNLR, Annual Technology Baseline 2025
Deep enhanced geothermal, example flash plant$6,653 per kWNLR, Annual Technology Baseline 2025
Drilling share of a new plant's capital cost30% to 57%NLR, 2025 drilling cost curves
Fervo Cape Station, cost per welldown from $9.4 million to $4.8 millioncompany statement, reported April 2024
Cost per foot drilled, Project Red pilot wells$995 and $1,107NLR, 2025 drilling cost curves
Cost per foot drilled, first six Cape Station wells (2023 to 2024)$634 falling to $346NLR, 2025 drilling cost curves

A 13,000 foot well at $346 to $634 a foot costs about $4.5 million to $8.2 million to drill, before completion. Our guide to geothermal wells covers depth, drilling records and how long wells keep their temperature.

03 / Method

How LCOE is calculated.

The levelized cost of electricity (LCOE) is the price per megawatt-hour at which a plant pays back everything spent on it over its life, including the return its lenders and owners expect. It divides discounted lifetime cost by discounted lifetime output:

LCOE = sum of (cost in year t / (1 + r)^t) / sum of (electricity exported in year t / (1 + r)^t)

Here r is the discount rate and t runs from construction to the last operating year. For geothermal the largest costs fall in year zero: drilling, completing the wells and building the power plant. Fuel is free. That makes the answer sensitive to the discount rate and to how long the wells keep their output.

Use exported electricity in the denominator. A geothermal plant spends some of its own output on pumps and auxiliaries, and an LCOE computed on gross generation flatters the plant. Our model exports gross generation minus pumping minus 5% of gross for auxiliaries.

04 / Targets

Published cost targets.

WhoTargetByApplies to
US Department of Energy, Enhanced Geothermal Shot$45/MWh2035enhanced geothermal systems
ARPA-E, SUPERHOT programunder $30/MWh2040reservoirs above 375 °C and 22 MPa, 10 to 20 GW
Zemanium$30 to $45/MWhdevelopment target, no date claimedour hardware and well program

The analysis behind the Department of Energy figure put developed deep enhanced geothermal at $45.60 per megawatt-hour in 2035, rounded to $45. All three rows are goals.

05 / Worked example

One simulated plant, three prices.

Our power-cost model holds the physics fixed and changes only the money. The reservoir starts at 200 °C, runs for 25 simulated years, and feeds a plant sized to its peak output of 28.322 MW gross.

CaseCapital assumptionsReal discount rateLCOE
Referencereference plant and well costs8%$83.02/MWh
Target package$1,500 per gross kW plant, $15m subsurface, $3m other8%$43.35/MWh
Target package, cheaper moneysame4%$35.00/MWh

SIMULATED · assumption scenarios · 5 October 2026

Halving the cost of capital takes $8.35 off each megawatt-hour without touching a single piece of equipment. Getting from $83.02 to $43.35 needs the plant and the wells to cost roughly what the target package says. No supplier has quoted those prices. They tell us what our hardware has to achieve.

The model runs 1,080 cost scenarios on output trajectories from GEOPHIRES-X 3.18.3, the open source simulator from NREL. It charges 2% of installed capital a year for operations, make-up water and $8 per exported megawatt-hour, books a $5m event in year 12 and $2m in year 25, and assumes the plant runs 90% of the time. A stress test draws 2,000 combinations of discount rate (4% to 12%), capital overrun (0.8 to 1.2 times) and a mid-life replacement of up to $10m.

06 / Drivers

What moves the cost.

Wells

The Department of Energy calls lower well construction cost a requirement for expanding enhanced geothermal, and puts casing and cementing alone at 30% to 40% or more of what a well costs. Drilling time is falling: Fervo Energy reports reaching 19,448 feet of measured depth in 21 days on its Sawtooth 7 well in July 2026.

Power per well

A well that produces twice the power halves the drilling bill per megawatt. ARPA-E says today's equipment limits enhanced geothermal to about 220 °C and about 10 megawatts of electricity per production well, and that wells above 375 °C could reach 30 to 50. That gap is why developers want superhot rock.

How long the output lasts

Cold water injected into hot rock cools the rock it touches. If the water sweeps a small volume, the produced temperature falls early and every later year earns less. Our model includes a case that fails this way: with the reservoir volume cut from 1 cubic kilometre to 0.014, the plant ends up importing power, and we publish no price for it.

Cost of capital

Because nearly all spending comes first, the discount rate acts on the whole bill. The example above moves 19% between 8% and 4%.

The plant on the surface

Hotter fluid converts a larger share of its heat to electricity, so a 200 °C plant needs more equipment per kilowatt than a hotter one. The model lets you set installed plant cost from $1,500 to $4,500 per gross kilowatt.

07 / Tool

Run the model yourself.

For a quick estimate with your own numbers, the LCOE calculator takes capital cost, operating cost, capacity factor, life and discount rate for any power plant. The power-cost model goes further for geothermal and runs in your browser with no account. Set the plant cost, subsurface cost, discount rate and a target price, and it returns the LCOE and the capital the design can afford. It also shows the cases that fail. The 3D reservoir explorer shows how flow, well spacing and rock temperature change thermal decline and pumping.

If you want this analysis for a specific project, or an independent review of a forecast, write to toni@zemanium.com.

08 / Questions

Common questions.

Is geothermal energy expensive?

It costs more to build and less to run than most sources. Lazard puts new geothermal at $67 to $111 per megawatt-hour in 2026, against $40 to $98 for utility solar and $37 to $99 for onshore wind, and geothermal runs day and night. Almost all of the cost is drilling and plant construction paid up front.

How is the LCOE of a geothermal plant calculated?

Add up every cost over the plant's life, discount each year's cost back to today, and divide by the discounted electricity exported over the same years. Subtract pumping and auxiliary power from generation first, because the plant consumes them itself.

How much does a geothermal well cost?

Fervo Energy reported its Cape Station wells falling from $9.4 million to $4.8 million each. NLR's 2025 analysis puts the first six Cape Station wells at $346 to $634 per foot drilled, and drilling at 30% to 57% of a new plant's capital cost. Our model treats the whole subsurface scope as an allowance of $15m, $25m or $37m per case.

How much does a geothermal power plant cost?

Lazard's 2026 range for a new plant is $5,135 to $6,635 per kilowatt of capacity, so a 50 MW plant costs roughly $257 million to $332 million. NLR's 2025 baseline averages $4,362 per kilowatt for hot hydrothermal sites and gives $6,653 for an example deep enhanced geothermal plant.

Is there a free geothermal LCOE calculator?

Yes. The Zemanium LCOE calculator prices any plant from capital cost, operating cost, capacity factor, life and discount rate, and the power-cost model at zemanium.com/confidence prices a simulated geothermal plant. Both run in a browser and need no account. For full reservoir and plant simulation, GEOPHIRES-X is open source.

Why does the discount rate matter so much for geothermal?

Nearly all the money is spent before the first megawatt-hour is sold, so the financing cost applies to almost the whole budget. In our simulated example the same plant costs $43.35 per megawatt-hour at an 8% real discount rate and $35.00 at 4%.

09 / Sources

Sources.

  1. Lazard, Levelized Cost of Energy+, version 19.0, 13 July 2026 (geothermal, solar and wind ranges, capital cost).
  2. National Laboratory of the Rockies, Annual Technology Baseline 2025: geothermal, read 27 November 2026 (capital costs, power purchase agreements).
  3. Akindipe and Witter, 2025 Geothermal Drilling Cost Curves Update, NREL/CP-5700-92793, July 2025 (drilling share, cost per foot).
  4. Journal of Petroleum Technology, Hot prospects, 18 April 2024 (Cape Station cost per well, company statement).
  5. US Department of Energy, DOE launches new Energy Earthshot to slash the cost of geothermal power, 8 September 2022.
  6. US Department of Energy, Energy Earthshots initiative report, January 2025 ($45.60/MWh basis).
  7. ARPA-E, SUPERHOT program, read 20 November 2026.
  8. US Department of Energy, Office of Geothermal, Enhanced geothermal systems, updated 20 August 2026 (casing and cementing share of well cost).
  9. Fervo Energy, third-generation well design release, 8 July 2026. Company statement.
  10. Zemanium, power-cost model, 5 October 2026. SIMULATED.
  11. NREL, GEOPHIRES-X, version 3.18.3.

Text and figures on this page are licensed CC BY 4.0. Cite as: Toni Zemani, "What geothermal electricity costs in 2026, and what sets the price", Zemanium, updated 27 November 2026.
All open models, records and drawings