3D unavailable in this browser. Every number below still updates — they come from the same model.
Design
Live readouts MODEL — live estimate
- Net power
- — MW
- Cost of electricity
- $—/MWh
- Production temperature
- — °C
- Pumping
- — MW
- Capital
- $—M
Baseline vs the design
Audited numbers of record — the system study's modern reference against the complete-system target case. AUDITED qa/thirty-mwh-audit-2026-09-14
Full stack at 320 °C (all five inventions land): —/MWh, — MW average net.
Independent check against NREL's GEOPHIRES-X simulator.